Oil & Gas in the Caspian
Incorporated on June 3, 2002, Punj Lloyd Kazakhstan is a 100% owned subsidiary of Punj Lloyd and is an active player in the engineering and construction business, like its parent company.
With offices in Almaty, Atyrau and Tengiz, Punj Lloyd Kazakhstan has built its reputation in projects of all dimensions and complexity requiring various skills, in the most demanding terrain and conditions. Be it flat deserts or icy plains, Punj Lloyd Kazakhstan has earned the reputation of delivering projects of quality, speed and economy. The company studied the market to achieve maximization of local content, Machinery - Manpower - Material. Also close proximity with Kazakh companies employing contemporary technology, gave the company an advantage.
The first project Punj Lloyd Kazakhstan undertook was the KAM 16” dia crude oil pipeline from Kumkol to Dhuzaly. Completed ahead of schedule, this project was important to the oil economy of Kazakhstan. The skilled and highly adaptable workforce with an Indian to Kazakh ratio 15:580 delivered results in temperatures ranging from -50°C to plus 50°C.
The Company created history while working on the large bore-small bore 333 km pipeline project for TengizChevroil/PFD in Kazakhstan by successfully and safely hydrotesting high pressure sour-gas injection line of 10" dia, 62 mm thick, 70 m Next Generation Gathering System (NGGS), at a pressure of 1,035 bar.
In keeping with the group philosophy of contributing towards community enrichment at its various project sites worldwide, Punj Lloyd Kazakhstan mobilized both manpower and equipment to restore a village affected by fire, contributing house-building material and rehabilitating people. Punj Lloyd sponsored the training for 6 of the best cardiac specialists of the National Clinical Hospital, Kazakhstan in Escorts Heart Institute, Delhi. With the world-class training they received, the Kazakh doctors conducted more than 500 surgeries since their return and achieved a success rate greater than 97%. The Company ordered handmade gloves from a deaf and dumb society at Atyrau to meet its site requirement as part of community development initiatives.
In Kazakhstan, we have successfully executed / under execution following projects :
- Oil & Gas Pipeline Project - Kashagan Experimental Program for AGIP KCO
Engineering, Procurement and Construction (EPC) of Export Oil & Gas Pipeline 24” 150 kms. Under execution.
Expected completion January 2009
- SGP Offsites & Utilities for Tengizchevroil / PFD at Tengiz.
Construction of Pipe fabrication and erection upto 70,000 inch dia with Mechanical equipment erection of 29 nos and 3 nos. tie ins.
Completed in October 2006.
- Large Bore and Small Bore Pipeline at Wellhead with Metering Station for Tengizchevroil / PFD at Tengiz.
Construction of 410 Kms Well connecting Flowlines 2” to 24” and Metering Station. Successfully executed welding of 10” Pipe with 33 mm thickness. Pipe fabrication and erection of 140,000 inch dia. Completed in September 2006.
- KAM Pipeline Project for Petrokazakhstan Kumkol Resources at Kyzylorda.
Construction of 16” X 177 Kms Crude Oil Pipeline from Kumkol to Dhuzaly with 85% of local content. Completed in May 2003.
For further information please contact:
| |
Punj Lloyd Kazakhstan LLP
Plot No. 7 "A", Atyrau Dossor Highway
DSK Area, Atyrau 060000
Republic of Kazakhstan
|
| |
|
| |
|
|